top of page

North Berkeley

1750 Sacramento St. Berkeley, CA

Project Manager: Jonathan Stern and Delvin Hall
Project Description

The North Berkeley BART Station development site is comprised of about 8.2 acres and is bounded by Virginia St. to the north, Delaware St. to the south, Sacramento St. to the east, and Acton St. to the west. BART’s underground tracks and station cross the site diagonally, so part of the site is designated a “Zone of Influence” (ZOI) on which any future buildings would need to meet specific requirements to avoid adverse effects on BART’s underground facilities. If this ZOI were subtracted, about 5.5 acres remain as developable.  That developable area is mainly used as BART rider parking with a total of about 620 spaces, excluding two auxiliary parking lots that will be kept as parking. The auxiliary parking lots are located to the northwest of the project site and have about 80 more parking spaces. 

NBB2.png
Financial Proforma Competency
  • Assisting and understanding the development of a proforma for a request for proposals (RFP) and request for qualifications (RFQ)

  • Attended a 3 part proforma training that covered navigating a proforma, types of financing, and differences in gap sources
  • Assisted in developing a Construction Progress Report template and manage monthly report submittals
Other
  • Compiled the necessary documentation to show BRIDGE's developer experience and track record of TOD projects

  • Attended weekly meetings with design team to draft and review RFP/RFQ materials

R.png
bottom of page